USAP RESEARCH SUPPORT FACILITIES SURVEY 1998-99 FIELD SEASON INSTRUCTIONS: Each Principal Investigator (PI) or Field Team Leader will receive this survey from Antarctic Support Associates (ASA) during their project in-briefing in Antarctica or at the port of departure, should complete it during the field season, and return it during the project's out-briefing. The survey is designed to collect information regarding research support facilities in the United States Antarctic Program (USAP), as an annual requirement for the Government Performance and Results Act (GPRA). Should you not complete and return the survey in Antarctica or points of arrival from Antarctica, then please complete and mail or fax it as soon as possible to: Chief Scientist Antarctic Support Associates 61 Inverness Drive East, Suite 300 Englewood, CO 80112 FAX 303/790-9130 Thank you for your cooperation. 1.PROJECT INFORMATION A. Event number and Principal Investigator _________________________ B. Field Team Leader (if different from PI) _________________________ C. All members of the Project Field Team __________________________ _______________________________ __________________________ _______________________________ __________________________ ________________________________ D. USAP Research Support Facility supporting your project ___ McMurdo and field camps ___ Palmer ___ Research Vessels and field camps ___ South Pole 2.QUALITY TIME IN ANTARCTICA A. Productive time 1.) Provide an estimate of the total number of productive days your project experienced this season in Antarctica _____ B. Unproductive time 1.) Provide in the spaces below estimates of the number of unpro- ductive days your project experienced this season in Antarctica for specific reasons and total. a.) __Days lost due to delays in cargo b.) __Days lost due to failure of equipment/instruments c.) __Days lost due to inadequate laboratory/observatory space d.) __Days lost due to problems with material (incorrect/insufficient) e.) __Days lost due to problems with transportation: __air __surface __research vessel __transport total f.) __Days lost due to bad weather delays g.) __Days lost due to other circumstances (specify) ______________________________________________________________ h.) ___Total unproductive days 3.EFFECTIVENESS OF PLANNING A. Provide below an estimate of your project's planned versus actual per- formance for the following activities. In front of your numbers, please usa a (-) sign to designate days lost and (+) sign for days gained. Record (0) for no days lost 1.) __Days in transit to Antarctica 2.)__Days in transit to field 3.) __Days for field training 4.)__Days for field testing/set-up 5.) __Days for experimentation & 6.)__Days for packing up data collection 7.)__Days in transit from field 8.) __Days in transit from Antarctica 9.)__Total 4.OVERALL ASSESSMENT A. Rate the support provided your project this season. __Unsatisfactory __Satisfactory __Excellent B. Considering your responses, does this survey capture the way in which the USAP Research Support Facility (see I.D.) supported your project? ___YES ___NO If No, then please suggest how the survey might be better constructed to capture this.